Project Name | Period | Client |
---|---|---|
200kW rated active controlled tidal current generation system design and production | Jul.2015 ~ Progress |
KIOST |
Chungju Jojeongji dam hydroelectric power plant detailed design | Mar. 2015 ~ Dec. 2015 |
K - Water |
Kyrgyzstan Toktogul hydroelectric power plant underwater inspection | Mar. 2015 ~ Nov. 2015 |
ADB |
Pakistan Gulpur hydroelectric power plant basic design | Jun. 2013 ~Dec. 2014 |
Saman Corporation |
Indonesia Semangka hydroelectric power plant Basic design | May 2013 ~Oct. 2015 |
POSCO Engineering Company |
Nepal Trishuri hydroelectric power plant Basic design | May 2013 ~Sept. 2013 |
Saman Corporation |
Indonesia Hasang hydroelectric power plant Basic design | Mar. 2013 ~Progress |
POSCO Engineering Company |
Cambodia pusat hydroelectric power plant feasibility | Jul. 2012 ~Oct. 2012 |
Hyundal Engineering |
Tanzania Lugoda dam feasibility, conduct design | Jul. 2012 ~Jun. 2013 |
Beomhan Engineering |
Youngheung 5,6 and Ocean hydro power plant | Jun. 2012 ~Sept. 2012 |
Gapjin General Construction |
Cambodia PrangLian hydroelectric power plant feasibility | May 2012 ~Oct. 2012 |
Hyundal Engineering |
DangJin 2 Small Hydro Power plants Detailed Design | Mar. 2012 ~Mar. 2012 |
Korea East-West Power Company |
Youngheung Ocean Small Hydro 5,6 Bid designing | Feb. 2012 ~Apr. 2012 |
Samsung Heavy Industries Co., Ltd |
orgia hydropower Bid designing | Dec. 2011 ~Feb. 2012 |
Hyundal E&C co., Ltd |
Suwoncheon Implementation Plans (proposed changes services) | Nov. 2011 ~Jun. 2012 |
HDC |
DangJin 2 Small Hydro Bid designing | Oct. 2011 ~Jan. 2012 |
Samsung Heavy Industries Co., Ltd |
GonjiamChon, Shinchon Water Resources flood recovery project designing | Sept. 2011 ~Oct. 2011 |
Korea Engineering Consultants Corp. |
Najudaem Dike Increase Business Basic Design Works | Jun. 2011 ~Jul. 2011 |
Korea Engineering Consultants Corp. |
Youngheung Thermal power 5,6 designing engineering services | May 2011 ~Dec. 2011 |
KOSEP |
Wampu hydroelectric power plant Detailed design (Mechanical and Electrical) | Jan. 2011 ~Progress |
POSCO Engineering Company |
Semung Hydroelectric Power Plant construction project in Indonesia (Civil Division) / FS report | Jun. 2011 ~Aug. 2011 |
POSCO Engineering Company |
Damyang Reservoir Small Hydro basic design | Apr. 2011 ~Jul. 2011 |
YOOSHIN Engineering Corporation |
Youngheung Ocean Small Hydro 5,6 Basic Design | Apr. 2011 ~Jan. 2012 |
Hyundal Engineering |
Cambodia Prek Liang hydroelectric power plant Feasibility study | Apr. 2011 ~Jul. 2011 |
Hyundal Engineering |
Indonesia Malea Hydroelectric Power Plant feasibility study | Aug. 2010 ~Nov. 2010 |
POSCO Engineering Company |
Asan Tangjeong district Distributed Rainwater Management Urban development corporation Of 2-D Numerical Part | Aug. 2010 ~Dec. 2011 |
|
Bohyeonsan Multipurpose Dam Construction Basic Design | Jul. 2010 ~Jul. 2010 |
YOOSHIN Engineering Corporation |
Buan Multipurpose Dam basic design | Jul. 2010~ Aug. 2010 |
|
Hangang 6tool Small Hydro Power Plant detailed design | May 2010 ~Jun. 2010 |
MOLIT |
Wampu Hydroelectric Power Plant construction project in Indonesia (Civil Division) / Detailed Design | Apr. 2010 ~Dec. 2012 |
POSCO Engineering Company |
Youngheung 1,2 Ocean Small Hydro Power Plant detailed design | Apr. 2010 ~Feb. 2011 |
KOSEP |
Philippine Kapangan Hydroelectric Power Plant feasibility study | Feb. 2010 ~Jun. 2010 |
K-Water |
Congo SNEL Hydroelectric Power Plant feasibility study | Feb. 2009 ~May 2009 |
Congo Power Authority |
Garolim tidal power plant detailed design | Jan. 2008 ~Progress |
Hyundal Engineering |
Ganghwa tidal power plant feasibility design | Jun. 2008 ~Feb. 2009 |
Hyundal Engineering |
Incheon tidal power plant feasibility design | Apr. 2008 ~Mar. 2009 |
Hyundal Engineering |