Project Name | Period | Client |
---|---|---|
Lotte Chungju 2 factory waste water treatment plant detailed design | Aug. 2015 ~ Progress |
Lotte Chilsung |
Brazil CSP power generation System piping design | Jan. 2013 ~Sept. 2013 |
POSCO Engineering Company |
SK Incheon petroleum Chem Compressor piping design | Jul. 2013 ~Oct. 2013 |
SK Incheon Petrochem |
First Color piping design | May 2013 ~Oct. 2013 |
BEC/ First Color |
POSCO Brazil continual casting equipment piping design | Aug. 2012 ~Jun. 2015 |
POSCO Engineering Company |
POSCO Brazilian steel manufacture plant piping design | Aug. 2012 ~Jun. 2015 |
POSCO Engineering Company |
POSCO Gwangyang Steel 4 continual casting clean water treatment facility piping design | Aug. 2012 ~Jun. 2015 |
POSCO Engineering Company |
Bahrain Ironworks piping design | Feb. 2012 ~Jun. 2012 |
CAN CAST/ SAMSUNG Engineering |
EMAC BIO Suncheon expansion construction machinery / piping design | Aug. 2011 ~Dec. 2011 |
EMAC BIO |
Hyundai Steel DangJin 2 plate mill water treatment plant piping design | Jun. 2011 ~Jan. 2012 |
Hyundal Steel |
OCI P3 Cleaning polysilicon process machinery / steel / piping design | Mar. 2011 ~Aug. 2011 |
OCI |
Paju LCD P9 Project piping design | Jan. 2011 ~Jul. 2011 |
LGD |
Malaysia GBD Bio-Diesel Plant | Nov. 2009 ~Nov. 2010 |
Malaysia GBD |
Gumi LCD pretreatment and industrial industrial water | Jul. 2010 ~Jan. 2011 |
LGD |
Uiam Hydro Power Plant Piping Design | Sept. 2008 ~Dec. 2012 |
Hyundal Engineering |
Cheongpyeong Hydro Power Plant Piping Design | Jan. 2007 ~Dec. 2010 |
Hyundal Engineering |