Sapgyo sea dike sluice gate extension project basic design Jun. 2015
~ Progress
KRC
Israel Gilboa pumped storage power plant, CW-7 pakege steel penstock design Jun. 2014 ~ Progress KD E&C
Najudaem Dike Increase Basic Design Apr. 2011~Jul. 2011 Korea Rural Community Corporation
Baekgok Reservoir Dike Increase Basic Design Apr. 2011
~Jul. 2011
Korea Rural Community Corporation
Damyang Reservoir Dike Increase Basic Design Apr. 2011
~Jul. 2011
Korea Rural Community Corporation
Yongsan River 1 area Water gate Authoring designing Mar. 2011
~Apr. 2011
Korea Rural Community Corporation
Yongsan River 3 area Water gate Authoring designing Mar. 2011
~Apr. 2011
Korea Rural Community Corporation
Indonesia Wampu hydroelectric power plant Penstok Detailed design Aug. 2010
~Sept. 2014
Indonesia
Reservoir Dike Increase Business Jeonbuk Area Basic and Detailed Design Jul. 2010
~Dec. 2010
Korea Rural Community Corporation
Seomjin Dam Cylinder Gate Chamber 3D Structural Analysis Jun. 2010
~Aug. 2010
K-Water
Bohyeonsan Multipurpose Dam Detailed Design Feb. 2010
~Jun. 2011
K-Water
Bohyeonsan Multipurpose Dam Turnkey Bid design Apr. 2010
~Jun. 2010
K-Water
Saemangeum Repellent Dongjin 5 Area Basic and Detailed Design Feb. 2010
~Nov. 2010
Korea Rural Community Corporation
Saemangeum Repellent Dongjin 4 Area Basic and Detailed Design Feb. 2010
~Oct. 2010
Korea Rural Community Corporation
Saemangeum Repellent Dongjin 1 Area Basic and Detailed Design Feb. 2010
~Nov. 2010
Korea Rural Community Corporation
Hwasun Flood Control Reservoir Water gate Basic and Detailed Design Feb. 2010
~Jun. 2010
K-Water
Hangang 6 Area Water gate Detailed design Mar. 2010
~Jul. 2010
MOLIT
Nakdong River Restoration 22 Area Detailed Water gate Design Mar. 2010
~Jul. 2010
MOLIT
Yongsan River-mouth Weir 3 Area Water gate Detailed Design May 2010
~Jul. 2010
Korea Rural Community Corporation